Why Extra Work Needs a Record Before the Tools Go Back in the Ute

Writer: Darren Canfield
Darren Canfield
Aug 27
4 min read

Updated: Sep 4

Dazza recording extra work on site before packing up the tools

Extra work is easiest to explain while everyone is still standing there looking at it. Three days later, it can become a completely different story.

G’day, it’s Dazza. Most extra work on a job doesn’t arrive with a formal announcement saying, “Attention everyone — this is now outside the original scope.”

It usually happens in the middle of the day. Something gets uncovered. A customer asks for one more thing. Another trade needs something shifted. A part doesn’t fit the way the drawing suggested. Somebody says, “While you’re here, can you just…?”

The work gets done because the tools are already out and everybody wants to keep the job moving. Then the ute gets packed, the next job starts, and the details begin disappearing.

The dangerous word is “just”

“Can you just move that?” “Can you just add another one?” “Can you just fix this while you’re here?”

Sometimes it really is a five-minute favour. Sometimes that little “just” means another hour, extra materials, a return trip, or work that was never allowed for in the original price.

The problem is not necessarily the extra work itself. The problem is doing it without leaving a clear record of what changed, why it changed and who knew about it.

By invoice time, a perfectly ordinary site conversation can turn into: “I thought that was included.”

Memory gets worse the moment you leave site

While you are doing the work, the details feel impossible to forget. You know what you found. You know who asked. You know which materials came out of the ute and roughly how long the extra work took.

Then you drive to another job.

By the end of the day there have been phone calls, suppliers, measurements, traffic, another customer and probably half a dozen other small decisions. By Friday, Tuesday’s obvious details are no longer quite so obvious.

That is why “I’ll write it up tonight” is risky. The best time to capture extra work is when the reason for it is still right in front of you.

A useful record does not need to be a novel

For ordinary site records, the goal is not to stop work for twenty minutes and write a report. It is to capture enough that future-you — and somebody who was not standing beside you — can understand what happened.

A practical record might answer a handful of simple questions: what extra work was done; why it was needed or requested; who requested or discussed it; when it happened; what labour, materials or equipment were involved; and whether there are photos that show the condition or completed work.

Depending on the contract and the type of work, formal variation or approval requirements may also apply. Those requirements differ between jobs and jurisdictions, so a quick site note is not a substitute for whatever written approval your contract or applicable rules require.

But even where another formal step is needed, capturing the facts immediately gives you something solid to work from instead of rebuilding the story from memory later.

Photos are stronger when they belong to the record

Yesterday I wrote about job photos getting lost in the camera roll. Extra work is exactly where that becomes important.

A photo of a rotten timber, unexpected pipe, damaged fitting or changed location can help explain why the job changed. A photo of the completed extra work can show what was actually done.

But the image becomes much more useful when it sits beside the note explaining the extra work rather than living three thousand photos deep in somebody’s phone.

The photo shows the condition. The record explains the story around it.

Capture it before the tools go back in the ute

There is a natural point on almost every job when the extra work is still fresh but the immediate rush has finished: just before packing up.

That is the moment worth using.

A minute or two to record the extra work, attach the relevant photos and note who was involved can save a much longer argument later. It also makes invoicing easier because the office is not trying to decipher a line saying “extras — 2 hrs” three weeks after the event.

The important thing is that the record happens as part of finishing the work, not as another admin job waiting for tonight.

This is the sort of small workflow I’m working on

This is one of the trade-admin problems I’m working through with Dazza: how to make recording extra work quick enough to happen on site, while the details are still obvious, without turning it into another giant form.

That work is still in development. There isn’t a finished Dazza extra-works tool I’m asking anyone to use today.

The principle matters regardless of the software: if the work changed, capture the story before everyone leaves the job.

A small record now beats a big explanation later

Most disputes do not start because nobody remembers anything. They start because everybody remembers enough to be confident — but not enough to remember exactly the same thing.

Extra work is easiest to record when the work, the people and the reason are all still in front of you.

Before the tools go back in the ute, take the minute. Future-you may be very glad you did.

 
 
 