Which Version of the Plan Are We Using? How Old Drawings Create New Problems
Two people can be on the same job with two different drawings. A quick version check can prevent hours of rework.


The Job’s Finished. Is the Record Finished?
The tools are packed up and the work is done. Before you leave site, make sure the photos, extras, decisions and loose ends are recorded too.


Customer-Supplied Materials: Who Owns the Risk When Something Doesn’t Fit?
Customer-supplied materials can blur the line between product problems and installation problems. A simple pre-install record can make the later conversation much clearer.


No Access, No Work: The Small Site Record That Can Save a Big Argument
You turned up ready to work, but the gate was locked or nobody was there. A simple no-access record can make the later conversation much clearer.


Why Extra Work Needs a Record Before the Tools Go Back in the Ute
Extra work is easy to remember while you’re standing on site. A few days later, the details get fuzzy. Here’s why a quick record before pack-up matters.